| 1. | Their work is to bulid another bridge cross the river 他们的工作是在那河上再架一座桥。 |
| 2. | Erection of the temporary bridge crossing for stream 33 32 竖设横渡河流编号32和33的临时桥 |
| 3. | Temporary bridge crossing for stream 33 32 is completion 横渡河流编号32和33的临时桥经已完成 |
| 4. | No bridge crossed the huangpu river 黄浦江上也没有一座桥。 |
| 5. | Erection of temporary bridge crossing for stream 25 near pak kung au 遴近于伯公坳竖设横渡河流编号25的临时桥 |
| 6. | Erection of the temporary bridge crossing for stream 26 near pak kung au 邻近于伯公坳竖设横渡河流编号26的临时桥 |
| 7. | Continuation of erection temporary bridge crossing for stream 25 near pak kung au 继续邻近于伯公坳竖设横渡河流编号25的临时桥 |
| 8. | Bridge cross vein 蜻蜓目桥横脉 |
| 9. | Erection of the temporary bridge crossing for stream 26 has been completed near pak kung au 邻近于伯公坳横渡河流编号26的临时桥经已完成 |
| 10. | This thesis studies shear lag effect on three representative forms of cable - stayed bridge cross sections by different theoretical methods 本文针对斜拉桥具有代表性的三种截面形式,采用不同理论计算方法对其剪力滞效应进行研究。 |